Hayes Mechanical provided complete mechanical systems installation for this 26,000 sq. ft. state of art combination training facility and wellness clinic. Work included mechanical construction management, mechanical installation, start-up, and on-going systems maintenance.
Equipment Installed
2 – Fulton Endura+ High-Efficiency Condensing Boilers
2 – Carrier AquaSnap Chillers with Air-Cooled Condensing Units
4 – Custom Built Air-Flow, Inc. Air Handlers
1 – Sullair Air Compressor
1 – Camfil Exhaust System
Auxiliary System pumps, sheet metal, VAV boxes, snow melt system, variable frequency drives, controls, and complete system piping.
Hayes Mechanical provided complete mechanical systems installation for this 129,000 sq. ft. medical facility. Work included mechanical construction management, mechanical installation and start-up.
Equipment Installed
4 – Fulton Vantage High-Efficiency Steel Tube Boilers with Riello Burners
3 – Carrier AquaSnap Air-Cooled Chillers
4 – Custom Air Flow Equipment, Inc. Air Handlers
4 – Neptronic Gas Fired Humidifiers
3 - Neptronic Electric Humidifiers
4 – Buderus Domestic Water Heaters
2 – Cummings Generator, Underground Piping Installation
Auxiliary System pumps, sheet metal, VAV boxes, Fan-Coil Units, Unit Heaters, variable frequency drives, controls, and complete system piping.
Hayes Mechanical provided complete mechanical systems installation for this 234 Ton air-cooled screw chiller replacement. Work included project management, equipment removal and new equipment setting, piping installation tie-in, and start-up.
Hayes Mechanical provided complete mechanical systems installation for (2) 110 Ton screw chillers. Work included project management, equipment removal and new equipment setting, piping installation, system tie-in, and start-up.
Hayes Mechanical provided complete mechanical systems installation for this new bakery. Work included project management, new equipment installation, new process piping, piping insulation, and start-up.
Equipment Installed
2 - Hurst Steel Tube Boilers with Riello Power Burners
1 – Feed Water System with Holding Tank and Pumps
1 – Condensate Return System and Pumps
1 – Process/Domestic and Clean-In-Place (CIP) Hot Water Heater and Tank and overhead mains piping
Installed 800+ feet of piping for process equipment with tie-ins for Proofer, Washers, Mixers Provided plant drain and storm drain installation with underground/excavated tie-ins
Hayes Mechanical provides comprehensive plumbing services for customer’s day to day needs and larger service projects, upgrades, and renovations.
Locations
30 North First Street Minneapolis MN, Large renovation project
Hertzing University Minneapolis MN, Dental School Renovation
Stacked Deck Brewery St. Paul MN, New Tenant Build-Out
Work typically includes
New fixtures, sinks, and piping plus demolition as required
Drain, waste, ejector, and venting systems
Domestic hot and cold water systems
Kitchen related equipment and auxiliary items
Booster pump systems
Natural gas, medical gas, and compressed air piping
Water meter, Backflow Prevention installation, testing, and certification
Hayes Mechanical Arizona office provides new plumbing construction services. Several recent construction projects have been performed with outstanding results, on time and on budget.
Projects Cost: $8,100,000.00+
Locations
Biltmore Spectrum Phoenix AZ, New Residential Construction
Tempe Watermark Tempe AZ, Large Renovation Project
Destiny Springs Hospital Surprise AZ, New Healthcare Facility Construction
Installation Includes
Complete Plumbing Fixture
Domestic Hot Water Systems
Piping/Risers Installation and Commissioning
Power Generation Plant Maintenance & Planned Outage Work
Hayes Mechanical provides exceptional maintenance and planned outage mechanical services to several power generation plants across the country. Work consists of boiler repairs, piping upgrades and repairs, environmental upgrades, fuel conversions, conveyor system maintenance and repairs, industrial fan maintenance and repairs, plus other various site repair needs and maintenance.
Total Man-hours: 2,200,000 +
Safety: <1.0 RIR
Quality: <1% Rework
Hayes Mechanical provided field installation expertise for this $42M project. Work included internal plant gas piping to and from gas dryers and ignition units, complete installation of new auxiliary boiler and related equipment.
Total Man Hours: 131,577
Safety: 0 RIR
Quality: <1% Rework
Equipment Installed
New Auxiliary Boiler
New Unit Ignitors
New Vacuum System Pumps
Hayes Mechanical provides field disassembly and reassembly services for large industrial fan-ventilation systems and other mission critical machinery. Our millwright teams are able to provide equipment rebuilding with required rigging and erection needs along with laser alignment and welding capabilities.
Hayes Mechanical has provided ongoing maintenance and outage services for Homer City Generating Station for 5+ years. Current man-hours are well over 500,000 with a <1.0% RIR and <1% rework. Recent project highlights;
Total Man-hours: 150,000+
Safety: <1.0 RIR
Quality: <1% Rework
Equipment Services Provided
Boiler Water Wall Replacement
Boiler Water Riser Replacement
Reheat Thermal Tube Replacement
SCR (Selective Catalytic Reducer) Replacement
Maintenance and Outage Mechanical Services